FFastBid24

Drawing reconciliation

Extraction tells you what's written. Reconciliation tells you whether it agrees.

Four documents describe Door 214. Right now they agree. Change one field — any field — and watch what a system that understands relationships does that a PDF reader never will.

DWGA-101 · Floor plan
Mark
Door 214
Wall
CMU, corridor
Note
Rated corridor wall
SCHA-601 · Door schedule
Mark
Door 214
Size
3'-0" × 7'-0"
Rating
90 min
Hdw
Set 12
HDW08 71 00 · Hardware Set 12
Exit device
Rim, fire-exit
Trim
Electrified lever
Seals
Rated smoke seals
SPEC08 11 13 · Specification
Openings
Rated per wall type
Corridor
90-min assemblies
Hardware
Match opening rating
Interactive demo
✓ Consistent

OCR reads pages

It gives you the text of one document at a time. Every contradiction survives, now in a spreadsheet.

Chat answers questions

Ask a PDF assistant about Door 214 and it summarizes whichever page it found first. It doesn't know the schedule and the spec are supposed to match.

Reconciliation takes a position

Consistent, review required, or information missing — every entity gets a verdict with the evidence attached. On live projects, this is how a rating conflict becomes an RFI instead of a change order.

This isn't hypothetical — see the disagreements FastBid24 caught on a real project →

See what FastBid24 finds in your project.

Every takeoff ships with the disagreements flagged and the RFIs drafted.