Real project · anonymized

One architectural set.

A daycare center in Central Texas. Drawings · schedule · Division 8 spec. Every number on this page is real pipeline output.

Let's open it up.

The package, exploded

Layer 01 · The package

Architectural set and Division 8 spec, exactly as issued.

41

doors

7

hardware sets

250

items mapped

14

sidelite rows

6

RFIs flagged

Same day

turnaround

What the documents were hiding

Three findings. Zero guesses.

Real project · anonymized

The door with no hardware

SCH

A111-B Door Schedule — Door D40 appears in the schedule — with no hardware set assigned.

HDW

Hardware sets HW-1 through HW-7 — No set references D40.

DATA

FastBid24 QA note (verbatim) — "Door D40 has no hardware set shown in the door schedule and is flagged for confirmation."

A silent row. Priced as-is, that's a door installed with no hardware in the bid — flagged instead of guessed.

The deliverable it became

Every layer above lands in one estimator-reviewed Excel workbook — schedule, sets, mapping, rollup, and the QA notes quoted verbatim in the findings.

The real Excel deliverable from this project: dashboard, door schedule, hardware sets, mapping and takeoff rollup tabs with QA notes

This was one project.

Every package hides something. The only question is whether it gets found before bid day or after contract award.

Run the autopsy on your own package.

Same pipeline, same QC review, same honesty about what it finds.