Scope intelligence
Scope gaps don't live on drawings. They live between them.
The most expensive line item on a project is often the one nobody owned. A requirement exists — but who priced it? Which bid carries it? Did every trade assume it was someone else's? Risk in construction is relational, and relational risk is invisible one document at a time.
One condition · five bids
One door with card access. Watch how many bids it crosses.
Select a trade to see what its documents actually say about this opening — and where the responsibility trail goes cold.
How a detail becomes a dispute
01
One detail
A single electrified opening on a corridor plan
02
6 documents
Plan, schedule, hardware set, two spec sections, one detail
03
4 trades
Doors & hardware, electrical, security, low voltage
04
12 requirements
Rating, size, power, termination, fail-secure behavior, conduit…
05
3 ownership questions
Power supply. Cabling. Termination.
06
One bid.
Whoever finds the gaps first decides who pays for them.
FastBid24's pipeline already surfaces document-level gaps on live projects — a door with no hardware set, a set with no door. See real examples from a real project → Full cross-scope gap detection is the direction the same relational data is headed — it's on the lab bench now.
Want to know what's sitting between your scopes?
Send a package before bid day. Flags and RFI-ready questions come back with the takeoff.